International Journal of Advance Computational Engineering and Networking (IJACEN)
.
Follow Us On :
current issues
Volume-12,Issue-8  ( Aug, 2024 )
Past issues
  1. Volume-12,Issue-7  ( Jul, 2024 )
  2. Volume-12,Issue-6  ( Jun, 2024 )
  3. Volume-12,Issue-5  ( May, 2024 )
  4. Volume-12,Issue-4  ( Apr, 2024 )
  5. Volume-12,Issue-3  ( Mar, 2024 )
  6. Volume-12,Issue-2  ( Feb, 2024 )
  7. Volume-12,Issue-1  ( Jan, 2024 )
  8. Volume-11,Issue-12  ( Dec, 2023 )
  9. Volume-11,Issue-11  ( Nov, 2023 )
  10. Volume-11,Issue-10  ( Oct, 2023 )

Statistics report
Dec. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 140
Paper Published : 1656
No. of Authors : 4371
  Journal Paper


Paper Title :
A Synchronous Model of Solving Train Scheduling Problem using Distributed Multi Agent System

Author :Raziyeh Moghaddas, Rula Khalid, Marwan Alshar’e, Sebastin Antony Joe

Article Citation :Raziyeh Moghaddas ,Rula Khalid ,Marwan Alshar’e ,Sebastin Antony Joe , (2018 ) " A Synchronous Model of Solving Train Scheduling Problem using Distributed Multi Agent System " , International Journal of Advance Computational Engineering and Networking (IJACEN) , pp. 5-9, Volume-6, Issue-11

Abstract : Train scheduling is an essential problem of railways networks programming. The most common type of railways is single-line which in turn creates more limitations. The efforts to solve this issue have been started since decades, the previous and current efforts work by applying various techniques that contributed to solve the problem in different concepts. However, despite the wide range of multi agent application and the complicated problems that solved by multi agent systems, there were no significant implementation and use of multi agent systems to solve the train scheduling problem. Therefore, we proposed a model for train scheduling in single-line railways, where we present a multi agent based model by formulating this problem as a distributed constraint satisfaction problem (DCSP). Since in railways the trains travel the different block simultaneously, hence the use of intelligent agents and provide a model that can solve the problem simultaneously matches with the issue perfectly. Existing synchronization in our proposed method avoids of unnecessary stop in trains travel and subsequently it gives an optimal scheduling. Experiments designed to evaluate the effectiveness of the suggested solution; the implementation of the algorithm goes on two directions with and without constraints. The result proves the multi agent systems ability to provide a valid contribution to solve the train scheduling issue. Keywords - Intelligent agents; multi-agent systems; distributed constraint satisfaction problem; train scheduling.

Type : Research paper

Published : Volume-6, Issue-11


DOIONLINE NO - IJACEN-IRAJ-DOIONLINE-14197   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 90
| Published on 2019-01-25
   
   
IRAJ Other Journals
IJACEN updates
Paper Submission is open now for upcoming Issue.
The Conference World

JOURNAL SUPPORTED BY